47176411-EC64-450C-A825-8B7885BE900A.jpeg
Other 10/25/2024

UGI Lehigh Valley Operations Center

This project was a multi-phase, LEED Silver-certified, 78,198-square-foot, two-story renovation of the Lehigh Valley Operations Center for UGI. It included the demolition of all existing interior and exterior systems and the installation of a new exterior building envelope with ACM and porcelain panels. The renovated space features multiple-use areas such as enclosed offices, open office spaces, conference rooms, several coffee stations, a training classroom, a fitness room, locker and shower rooms, basement storage, and multiple collaboration spaces. Additionally, 10,000 square feet of warehouse space was added, including a new emergency response storage shop and M&R shop.

The main office space comprises roughly 70% of the building and includes open spaces with aluminum-framed glass-enclosed offices, multiple ceiling levels due to both design and existing building structure restrictions discovered during demolition, and a feature lobby with a pantry-kitchen space and a monumental stair with all wood treads, risers, landings, and a first-floor platform with benches. The remaining 30% of the building consists of the warehouse, shop, and locker room spaces, which feature an overhead crane, an industrial racking system, and multiple floor levels due to exterior access and existing loading docks.

The original building, dating back to the 1960s, presented several issues during construction. Due to the client's operational needs, the project required multiple phases to be completed in different sequences, allowing them to move in and out of each area while remaining operational. One issue involved the concrete plank deck system for the roof, which was found to be too brittle to mount in-building utilities as per typical details. Consequently, it was necessary to through-bolt these anchors in over 350 locations. Another challenge was scheduling construction around and during client operations, sometimes requiring off-hour construction and special coordination to ensure the construction scope was completed safely and with quality, while still allowing the client to maintain 24/7 emergency operations. Despite these challenges, the project produced quality results and a beautiful new space for UGI to operate in the Lehigh Valley area.

View Project Details
ACMarriott_0577.tif
Hospitality 09/06/2024

AC Hotel by Marriott

HCC successfully completed the AC Hotel by Marriott in Newtown Square, PA, a 140-room hotel designed with modern amenities and high-end finishes. The scope of the project included the construction of guest accommodations, four 700-square-foot king suites, a lounge/bar, a fitness center, and large floor-to-ceiling aluminum windows in every guestroom, providing ample natural light. Exterior finishes included wood-look EIFS, enhancing the sleek, contemporary aesthetic of the building.

HCC’s responsibilities extended beyond standard construction, as the project involved significant coordination with multiple simultaneous developments on the same site. The hotel shares infrastructure and an exterior wall with an adjacent restaurant, requiring precise integration of shared spaces, including a connecting door. The team also managed complex crane operations, with a tower crane overlapping with mobile cranes from neighboring projects, necessitating careful scheduling and safety measures.

To ensure project efficiency and minimize disruptions, HCC employed 3D BIM coordination for all MEP+S trades, allowing for early identification of potential conflicts. This advanced planning contributed to maintaining the project schedule and avoiding costly delays. The construction team also implemented strict safety protocols to manage work around active construction sites, ensuring a seamless execution despite the challenges of the tight site and concurrent builds.

HCC delivered the AC Hotel on time, while adhering to stringent safety requirements and ensuring high-quality construction throughout. The project’s complexity and the coordination it required stand as a testament to HCC’s ability to manage challenging construction environments while maintaining focus on delivering superior results.

View Project Details
Home2Suites_0144.tif
Hospitality 05/27/2024

Home2 Suites

The new Home 2 Suites in Bethlehem, PA, is a 73,442-square-foot extended stay hotel offering 117 units, conveniently located near the Lehigh Valley Airport and just off Route 22. The hotel is a wood-framed structure situated on a 2.99-acre parcel that features upgraded onsite underground infiltration beds, installed under approximately 50% of the new parking lot and driveways. This infrastructure enhancement ensures efficient water management, contributing to the property's sustainability efforts.

 

This four-story hotel caters to both long- and short-term guests with a range of amenities designed for comfort and convenience. Guests can enjoy an indoor pool, fitness facilities, and laundry services, alongside a breakfast service and the Hilton Home 2 marketplace. Outdoor patios at the front and rear of the building offer seating, tables, grills, and a gas fire pit for relaxation. Each guest room is equipped with queen or king beds, full bathrooms, and kitchenettes featuring dishwashers, refrigerators, and microwaves. The hotel also includes onsite management offices, maintenance and storage rooms, and comprehensive support staff areas equipped with industrial washers and dryers, a security system, and individual fire management systems for each guest room.

View Project Details
Hankin_0027.tif
Other 05/24/2024

Queen Street Core & Shell

The Queen Street project site spanned 3.89 acres in downtown Lancaster, consisting of two lots. Lot 1 housed a historical building that required demolition, while Lot 2 featured a neglected parking lot, overgrown with weeds. The site transformation was remarkable, turning a previously abandoned area into a revitalized space. What once appeared forgotten amidst one of downtown Lancaster's main roads was given new life.

The 4-story building featured a façade of brick veneer, fiber cement, and metal panels. The second and third floors on the Queen Street side and the parking lot side were composed entirely of curtain walls, lending the building a modern appearance. Despite this, the brick veneer maintained Lancaster’s traditional aesthetic, making the building seem as if it had always been part of the cityscape. This project breathed new life into one of the city's oldest areas.

View Project Details
Armstrong_1243.tif
Other 02/12/2024

Armstrong Building 402 Lower Level

The renovation of Armstrong Building 402 in Lancaster, PA, encompassing 43,211 square feet of ground floor commercial office space, product showcase areas, and a customer training center, showcases meticulous design, environmental consciousness, and innovative features such as advanced HVAC systems, sustainable material sourcing, and unique ceiling and wall systems to create a revitalized and functional workspace.

View Project Details
Starbucks_7253.jpg
Other 10/06/2023

Greenfield Starbucks

High Construction served as the construction manager for the shell of this new Starbucks off of Route 30 and Greenfield Road.

View Project Details
thumbnail_LandisPlace_0360.jpg
Other 09/09/2023

Landis Place on King

The 122,587 sf Landis Place on King project provides 79 modern apartments for the over-55 market, centrally located in Downtown Lancaster. There are five metal-framed floors of apartments above a two-story concrete podium. The building also includes restaurant and office space on the Ground Level. It is next door to a grocery store and within walking distance of churches, shops, restaurants and Central Market.

The seven-story building features many amenities for its urban residents. There is a large Community Room space (Conexión) on the 1st level, generously sized elevator lobbies on each floor each furnished according to a special theme, and a 6th floor glass-enclosed party room with outdoor terrace and fire table. The individual units include full kitchens, walk-in showers and spacious closets with wire shelving. Each unit has an outdoor balcony, many with dramatic views of the city skyline. A secure, fully indoor parking garage on the 1st floor has space for ​41 vehicles and ​24 bicycles, plus several charging stations for electric vehicles. There are property management and maintenance staff stationed on-site.

View Project Details
Hyatt_House_0810.jpg
Hospitality 06/30/2023

Hyatt House-Hyatt Place

This 130,000 square foot, 6-story hotel is a dual-brand Hyatt Place and Hyatt House. A total of 110 rooms belong to Hyatt Place, with the remaining 95 rooms dedicated to Hyatt House, an extended-stay property. Amenities include an Olympic-size indoor pool with an outside seating area, gill, firepit and exercise facility, as well as on-site restaurant dining.

View Project Details
PennStHPed_0182.JPG
Other 06/30/2023

Penn State Health Pediatric Center

Completed in June of 2022, this 47,000 SF renovated building includes a shell and fitout space for Penn State Health Pediatrics.

View Project Details
Eurofins_39_0144.jpg
Industrial & Manufacturing 05/05/2023

Eurofins Parking Garage

This 8-story, 414,000 square foot, two-tone precast parking garage, featuring 1,241 parking spaces, an indoor and outdoor shuttle waiting area and two passenger elevators, was built to support the ever-expanding Eurofins BioPharma Product Testing site located in Lancaster, PA, just 15 minutes North of downtown Lancaster City. This BioPharmaceutical and Medical Device testing facility is part of the largest network of harmonized GMP testing laboratories across the globe.

Unstable ground conditions and subsurface caverns required the garage to be built on concrete foundations supported by 287 concrete-encased steel micropiles that anchored into bedrock below the surface, sometimes at depths in excess of 150 linear feet. This, combined with a high water-table, posed continuous challenges in creating effective stability for the building to begin vertical construction.

This facility was built in a uniquely collaborative effort between High Construction (providing construction management services), High Concrete, High Erectors and High Transit, with each piece of precast concrete being touched by approximately 100 of High's esteemed personnel. This project is recognized as the first of many collaborative projects to come.

View Project Details
Madison 2 Pool-Overlook .jpg
Multi-Family 02/28/2023

Madison Ellis Preserve

Madison Ellis Preserve is a new multi-family residential community with amenities geared toward empty-nesters and young professionals. Located in Newtown Square, Pa., the community features three (3) four-story buildings totaling 339,000 square feet, a clubhouse facility, and an extensive courtyard. There are 251 one- and two-bedroom layouts with state-of-the-art amenities.

View Project Details
Extra Space Storage Exterior
Commercial 01/30/2023

Extra Space Storage

High Construction served as the construction manager and the builder for this five-story, 81,000-square-foot self-storage facility on a five-acre site with parking. 

View Project Details
Waterfront_1646.jpg
Commercial 01/06/2023

The Waterfront

High Construction provided construction management services for Jaindl Enterprises' 560 Waterfront Drive (multifamily residential building) and 545 Riverside Drive (parking garage) as part of this ambitious project. Situated along the picturesque banks of the Lehigh River in Allentown, PA, this monumental $500 million development initiative, aptly named The Waterfront, is set to feature a diverse blend of office spaces, retail establishments, parking facilities, and residential structures.

View Project Details
HighLeadershipCenter1.jpg
Commercial 12/30/2022

S. Dale High Leadership Center

High Construction served as the construction manager for the renovation and addition to an existing 1980s building in Lancaster, Pa., that previously served as offices for a university. The project included 6,500 square feet of interior renovations, a 3,500 square foot addition, exterior wall renovations, and a new courtyard. The newly transformed building, called The S. Dale High Leadership Center, celebrates the rich history of the High companies.

View Project Details
02_NewarkCharter_Exterior_Compressed.jpg
Higher Education 12/30/2022

Newark Charter School

This 60,000-square-foot, two-story facility for Newark Charter School in Newark, DE, accommodates 640 students in grades 5-8. The new building contains a large multi-purpose room, band room, media center, and computer room, as well as classrooms and administrative areas.

View Project Details
Landis Homes Learning and Wellness Center Exterior
Senior Living 12/30/2022

Landis Homes Learning & Wellness Center

Located in the heart of the Landis Homes campus in Lititz, Pa., the new Learning and Wellness Center and Crossings Apartments provide a “front door” to the existing Landis Homes senior living community, replacing several older cottages that were located on the site.

View Project Details
LNP Parking Garage Exterior
Industrial & Manufacturing 12/30/2022

Lancaster Newspapers Parking Garage

High Construction was selected to provide preconstruction, design-build, and construction management services for this 151,200-square-foot parking garage addition to Lancaster Newspaper’s existing parking garage in Lancaster, Pa.

View Project Details
Highland Presbyterian Church Exterior at Twilight
Commercial 12/30/2022

Highland Presbyterian Church

This project consisted of a 40,780-square-foot church narthex, multipurpose room, and classroom addition. The project also includes a sprinkler/ceiling renovation of the existing facility and a new 1,237-square-foot entrance canopy.

View Project Details
Hilton Garden Inn Corning Exterior Daytime
Hospitality 12/30/2022

Hilton Garden Inn – Corning Downtown

Located in the heart of downtown Corning, on the former site of a Days Inn, this new five-story Hilton Garden Inn provides an anchor to the revitalization of Corning's north side. 

View Project Details
Marriott at Penn Square and Lancaster County Convention Center External
Hospitality 12/30/2022

Marriott at Penn Square and Lancaster County Convention Center

High Construction was selected as the prime contractor for all general trades work for the renovation and conversion of the historical Watt & Shand building in downtown Lancaster, Pa., (as well as the integration of five historic homes within the street block) to an upscale, full-service Marriott hotel with an adjoining 195,000-square-foot convention center.

View Project Details
TownePlace Suites Harrisburg West Mechanicsburg Exterior at Dusk
Hospitality 12/30/2022

TownePlace Suites Harrisburg West

This new, five-story hotel features rooms with kitchens (including refrigerators, stovetops, microwaves, and dishwashers). Other hotel amenities include an indoor pool, a fitness center, an arcade/game room, and a picnic area.

View Project Details
Spring Hill Suites - Mt. Laurel Exterior
Hospitality 12/30/2022

SpringHill Suites Mt. Laurel, NJ

Located in Mt. Laurel, NJ, this new SpringHill Suites spans four stories and includes  134 suites. Other hotel amenities include a breakfast buffet, indoor pool, outdoor patio and fire pit, guest lounge, meeting facility, and a fitness center.

View Project Details
High Steel Service Center Warehouse
Industrial & Manufacturing 12/30/2022

High Steel Service Center

High Steel Service Center expanded its warehouse complex to over 200,000 square feet with the addition of the Bay 5 process line.

View Project Details
Messiah University - Calvin and Janet High Center for Worship and Performing Arts - Exterior
Higher Education 12/30/2022

Messiah University Performing Arts Center

High Construction provided construction management services for this worship and performing arts center project, which is an addition/renovation to Messiah College’s existing Climenhaga Fine Arts Center.

View Project Details